PROJECT #1 – LAYOUT OF MILL CREEK REGIONAL PARK

OWNERSTATESBORO/ BULLOCH RECREATION DEPARTMENT

LOCATION STATESBORO, GA

YEAR COMPLETED – 1991-1993

DESCRIPTION – STAKE OUT (12) BASEBALL/ SOFTBALL FIELDS (ALL GRADING, FOUL POLES, DOUGOUTS, ETC.) STAKE GRADING ON (4) SOCCER FIELDS. STAKE ALL STORM DRAIN STRUCTURES, SANITARY SEWER MANHOLES, WATER LINES, PUMP STATION, ETC. ON ENTIRE 150 ACRE COMPLEX. STAKE OUT ALL CURB AND GUTTER FOR ALL PARKING LOTS. STAKE NEW IRRIGATION LAKE. STAKE ALL STADIUM LIGHTING STUCTURES.

VALUE$40,000+

PERSON IN CHARGE – JAMES M. ANDERSON


PROJECT #2 – BRYAN COUNTY INDUSTRIAL PARK

OWNER - BRYAN COUNTY DEVELOPMENT AUTHORITY

LOCATION – I-16 AT HIGHWAY 280

YEAR COMPLETED – 2002

DESCRIPTIONLAYOUT ALL STORM STRUCTURES ASSOCIATED WITH 1.7 MILE LONG INDUSTRIAL PARK BLVD. STAKE NEW SANITARY SEWER MANHOLES AND NEW WATER LINES. STAKE CURB AND GUTTER ON DIVIDED BLVD. WITH MEDIAN.

VALUE - $15,000

PERSON IN CHARGE – JAMES M. ANDERSON


PROJECT #3NEW SOUTHEAST BULLOCH MIDDLE SCHOOL

EMPLOYER – MCKNIGHT CONSTRUCTION, AND VARIOUS SUBCONTRACTORS

LOCATION – BROOKLET, GA

YEAR COMPLETED – 2004

DESCRIPTION- STAKE OUT ENTIRE SITE FOR GENERAL CONTRACTOR, INCLUDING ALL BUILDING CORNERS ON $20,000,000 SCHOOL, ALL STORM STRUCTURES, NEW SANITARY SEWER LINES, AND ALL CURB AND GUTTER ON NEW PARKING LOTS, BUS DRIVES, AND STUDENT DROP OFF DRIVES.

VALUE – $52,000

PERSON IN CHARGE – JAMES M. ANDERSON AND WRIGHT KELLETT


PROJECT # 4 – SPLASH IN THE BORO

EMPLOYER – SWIM PRO POOLS

LOCATION – STATESBORO, GA

YEAR COMPLETED – 2004

DESCRIPTION – STAKE OUT NEW AQUATIC CENTER. LAYOUT SEVERAL POOLS (KIDS POOL, COMPETION POOL, LAZY RIVER) LAYOUT NEW BUILDINGS (CONSESSION STANDS, RESTROOMS, KIOSK) LAYOUT NEW WATER LINES SUPPLYING WATER TO POOLS. LAYOUT NEW STORM AND SANITARY MANHOLES.

VALUE - $18,600

PERSON IN CHARGE – JAMES M. ANDERSON AND WRIGHT KELLETT


PROJECT #5 – MEADOWS REGIONAL MEDICAL CENTER

EMPLOYER – HAYWARD BAKER INC. (PILE DRIVING SUBCONTRACTOR) BRASFIELD AND GORRIE (GC)

LOCATION – VIDALIA, GA

YEAR COMPLETED – 2009

DESCRIPTION – STAKE BUILDING COLUMM LINES FOR NEW MEADOWS HOSPITAL. STAKE APPROXIMENTLY 750 PILE LOCATIONS FOR PILE CONTRACTOR.

VALUE - $15,000

PERSON IN CHARGE – JAMES M. ANDERSON


PROJECT #6 – RICHMOND HILL MIDDLE SCHOOL

EMPLOYER – ELLIS WOOD CONTRACTING (GRADING CONTRACTOR) HENSLER AND BEAVERS GENERAL CONTRACTING INC.

LOCATION – MIDWAY, GA

YEAR COMPLETED – CURRENTLY UNDER CONSTUCTION

DESCRIPTION- LAYOUT CLEARING LIMITS, BUILDING PADS, PARKING LOTS, DRIVEWAYS , SOFTBALL , BASEBALL AND FOOTBALL FIELDS, DETENTON PONDS, ETC. ON NEW 100 ACRE SCHOOL SITE FOR GRADING CONTRACTOR. STAKE BUILDING CORNERS, CURB AND GUTTER, LIGHT POLES AND FENCING FOR GENERAL CONTRACTOR. CALCULATE ALL GRADES ON CURB AND GUTTER. BUILD A 3 DIMENSIONAL SURFACE FILE FOR MACHINE GRADING AND LINE WORK FILE FOR CONSTRUCTING STORM SYSTEM.

VALUE – $45,000

PERSON IN CHARGE – JAMES M. ANDERSON, RAMOND LAMB, AND WRIGHT KELLETT


PROJECT # 7– TRUST FOR PUBLIC LAND – ELAINE G. MORGAN TRACT

EMPLOYER – THE TRUST FOR PUBLIC LAND

LOCATION: LIBERTY COUNTY, GEORGIA & BRYAN COUNTY, GEORGIA

YEAR COMPLETED – 2008

DESCRIPTION – COMPLETE BOUNDARY SURVEY OF 1334 ACRES.  THIS TRACT HAD NOT BEEN SURVEYED IN 50 PLUS YEARS.  WE HAD TO DO A GOOD BIT OF RECORDS RESEARCH.  THERE WAS A LOT OF BOUNDARY RETRACEMENT WORK.  WE HAD MANY LOST OR OBLITERATED PROPERTY CORNERS.  WE HAD TO CONTACT ADJACENT LAND OWNERS AND ANALYZE PHYSICAL EVIDENCE, OLD PLATS, DEED, ETC… THE TRACT WAS MOSTLY A TIMBER TRACT.

VALUE – $25,000.00

PERSON IN CHARGE – JAMES M. ANDERSON AND MATT ANDERSON


PROJECT #8 – THE GEORGIA DEPT. OF NATURAL RESOURCES – DUKES POND TRACT

EMPLOYER – THE GEORGIA DEPT. OF NATURAL RESOURCES

LOCATION – JENKINS COUNTY, GEORGIA

YEAR COMPLETED – 1998

DESCRIPTION- BOUNDARY SURVEY OF APPROXIMATELY 1227 ACRES. THIS WAS MOSTLY A LARGE TIMBER TRACT PREVIOUSLY OWNED BY A PAPER COMPANY AND WAS BEING PURCHASED BY THE STATE OF GEORGIA TO ESTABLISH A WILDLIFE REFUGE ON.  THE PERIMETER OF THE TRACT HAD TO BE BLAZED AND PAINTED TO DNR SPECIFICATIONS AND THE PROPERTY CORNERS SET WERE 30 ″ BERNSTEIN MONUMENTS STAMPED TO DNR SPECIFICATIONS.  A SURVEYORS REPORT WAS REQUIRED AND A LEGAL DESCRIPTION HAD TO BE SCRIVENERED BY THE SURVEYOR.

VALUE – $11,250

PERSON IN CHARGE – JAMES M. ANDERSON AND MATT ANDERSON


PROJECT #9 – WILLIAM F. TANKERSLEY ESTATE SURVEY

EMPLOYER – STEPHEN TANKERSLEY, EXECUTOR OF WILLIAM F. TANKERSLEY ESTATE.

LOCATION – BULLOCH COUNTY, GEORGIA

YEAR COMPLETED – 2009

DESCRIPTION- PLANNING AND SUBDIVIDING THE FARM FOR THE ESTATE OF WILLIAM F. TANKERSLEY.  THIS FARM TOTALED 276 ACRES AND WAS DIVIDED INTO 5 TRACTS TO SATISFY THE WILL OF WILLIAM F. TANKERSLEY. WE HAD SEVERAL MEETINGS WITH THE EXECUTOR TO GET INSTRUCTION AS TO HOW THE FARM WAS TO BE DIVIDED.  RESEARCHING RECORDS AND RETRACEMENT WAS A LARGE PART OF THE JOB.

VALUE – $12,569

PERSON IN CHARGE – JAMES M. ANDERSON AND MATT ANDERSON