PROJECT #1 – LAYOUT OF MILL CREEK REGIONAL PARK
OWNER – STATESBORO/ BULLOCH RECREATION DEPARTMENT
LOCATION – STATESBORO, GA
YEAR COMPLETED – 1991-1993
DESCRIPTION – STAKE OUT (12) BASEBALL/ SOFTBALL FIELDS (ALL GRADING, FOUL POLES, DOUGOUTS, ETC.) STAKE GRADING ON (4) SOCCER FIELDS. STAKE ALL STORM DRAIN STRUCTURES, SANITARY SEWER MANHOLES, WATER LINES, PUMP STATION, ETC. ON ENTIRE 150 ACRE COMPLEX. STAKE OUT ALL CURB AND GUTTER FOR ALL PARKING LOTS. STAKE NEW IRRIGATION LAKE. STAKE ALL STADIUM LIGHTING STUCTURES.
VALUE – $40,000+
PERSON IN CHARGE – JAMES M. ANDERSON
PROJECT #2 – BRYAN COUNTY INDUSTRIAL PARK
OWNER - BRYAN COUNTY DEVELOPMENT AUTHORITY
LOCATION – I-16 AT HIGHWAY 280
YEAR COMPLETED – 2002
DESCRIPTION – LAYOUT ALL STORM STRUCTURES ASSOCIATED WITH 1.7 MILE LONG INDUSTRIAL PARK BLVD. STAKE NEW SANITARY SEWER MANHOLES AND NEW WATER LINES. STAKE CURB AND GUTTER ON DIVIDED BLVD. WITH MEDIAN.
VALUE - $15,000
PERSON IN CHARGE – JAMES M. ANDERSON
PROJECT #3 – NEW SOUTHEAST BULLOCH MIDDLE SCHOOL
EMPLOYER – MCKNIGHT CONSTRUCTION, AND VARIOUS SUBCONTRACTORS
LOCATION – BROOKLET, GA
YEAR COMPLETED – 2004
DESCRIPTION- STAKE OUT ENTIRE SITE FOR GENERAL CONTRACTOR, INCLUDING ALL BUILDING CORNERS ON $20,000,000 SCHOOL, ALL STORM STRUCTURES, NEW SANITARY SEWER LINES, AND ALL CURB AND GUTTER ON NEW PARKING LOTS, BUS DRIVES, AND STUDENT DROP OFF DRIVES.
VALUE – $52,000
PERSON IN CHARGE – JAMES M. ANDERSON AND WRIGHT KELLETT
PROJECT # 4 – SPLASH IN THE BORO
EMPLOYER – SWIM PRO POOLS
LOCATION – STATESBORO, GA
YEAR COMPLETED – 2004
DESCRIPTION – STAKE OUT NEW AQUATIC CENTER. LAYOUT SEVERAL POOLS (KIDS POOL, COMPETION POOL, LAZY RIVER) LAYOUT NEW BUILDINGS (CONSESSION STANDS, RESTROOMS, KIOSK) LAYOUT NEW WATER LINES SUPPLYING WATER TO POOLS. LAYOUT NEW STORM AND SANITARY MANHOLES.
VALUE - $18,600
PERSON IN CHARGE – JAMES M. ANDERSON AND WRIGHT KELLETT
PROJECT #5 – MEADOWS REGIONAL MEDICAL CENTER
EMPLOYER – HAYWARD BAKER INC. (PILE DRIVING SUBCONTRACTOR) BRASFIELD AND GORRIE (GC)
LOCATION – VIDALIA, GA
YEAR COMPLETED – 2009
DESCRIPTION – STAKE BUILDING COLUMM LINES FOR NEW MEADOWS HOSPITAL. STAKE APPROXIMENTLY 750 PILE LOCATIONS FOR PILE CONTRACTOR.
VALUE - $15,000
PERSON IN CHARGE – JAMES M. ANDERSON
PROJECT #6 – RICHMOND HILL MIDDLE SCHOOL
EMPLOYER – ELLIS WOOD CONTRACTING (GRADING CONTRACTOR) HENSLER AND BEAVERS GENERAL CONTRACTING INC.
LOCATION – MIDWAY, GA
YEAR COMPLETED – CURRENTLY UNDER CONSTUCTION
DESCRIPTION- LAYOUT CLEARING LIMITS, BUILDING PADS, PARKING LOTS, DRIVEWAYS , SOFTBALL , BASEBALL AND FOOTBALL FIELDS, DETENTON PONDS, ETC. ON NEW 100 ACRE SCHOOL SITE FOR GRADING CONTRACTOR. STAKE BUILDING CORNERS, CURB AND GUTTER, LIGHT POLES AND FENCING FOR GENERAL CONTRACTOR. CALCULATE ALL GRADES ON CURB AND GUTTER. BUILD A 3 DIMENSIONAL SURFACE FILE FOR MACHINE GRADING AND LINE WORK FILE FOR CONSTRUCTING STORM SYSTEM.
VALUE – $45,000
PERSON IN CHARGE – JAMES M. ANDERSON, RAMOND LAMB, AND WRIGHT KELLETT
PROJECT # 7– TRUST FOR PUBLIC LAND – ELAINE G. MORGAN TRACT
EMPLOYER – THE TRUST FOR PUBLIC LAND
LOCATION: LIBERTY COUNTY, GEORGIA & BRYAN COUNTY, GEORGIA
YEAR COMPLETED – 2008
DESCRIPTION – COMPLETE BOUNDARY SURVEY OF 1334 ACRES. THIS TRACT HAD NOT BEEN SURVEYED IN 50 PLUS YEARS. WE HAD TO DO A GOOD BIT OF RECORDS RESEARCH. THERE WAS A LOT OF BOUNDARY RETRACEMENT WORK. WE HAD MANY LOST OR OBLITERATED PROPERTY CORNERS. WE HAD TO CONTACT ADJACENT LAND OWNERS AND ANALYZE PHYSICAL EVIDENCE, OLD PLATS, DEED, ETC… THE TRACT WAS MOSTLY A TIMBER TRACT.
VALUE – $25,000.00
PERSON IN CHARGE – JAMES M. ANDERSON AND MATT ANDERSON
PROJECT #8 – THE GEORGIA DEPT. OF NATURAL RESOURCES – DUKES POND TRACT
EMPLOYER – THE GEORGIA DEPT. OF NATURAL RESOURCES
LOCATION – JENKINS COUNTY, GEORGIA
YEAR COMPLETED – 1998
DESCRIPTION- BOUNDARY SURVEY OF APPROXIMATELY 1227 ACRES. THIS WAS MOSTLY A LARGE TIMBER TRACT PREVIOUSLY OWNED BY A PAPER COMPANY AND WAS BEING PURCHASED BY THE STATE OF GEORGIA TO ESTABLISH A WILDLIFE REFUGE ON. THE PERIMETER OF THE TRACT HAD TO BE BLAZED AND PAINTED TO DNR SPECIFICATIONS AND THE PROPERTY CORNERS SET WERE 30 ″ BERNSTEIN MONUMENTS STAMPED TO DNR SPECIFICATIONS. A SURVEYORS REPORT WAS REQUIRED AND A LEGAL DESCRIPTION HAD TO BE SCRIVENERED BY THE SURVEYOR.
VALUE – $11,250
PERSON IN CHARGE – JAMES M. ANDERSON AND MATT ANDERSON
PROJECT #9 – WILLIAM F. TANKERSLEY ESTATE SURVEY
EMPLOYER – STEPHEN TANKERSLEY, EXECUTOR OF WILLIAM F. TANKERSLEY ESTATE.
LOCATION – BULLOCH COUNTY, GEORGIA
YEAR COMPLETED – 2009
DESCRIPTION- PLANNING AND SUBDIVIDING THE FARM FOR THE ESTATE OF WILLIAM F. TANKERSLEY. THIS FARM TOTALED 276 ACRES AND WAS DIVIDED INTO 5 TRACTS TO SATISFY THE WILL OF WILLIAM F. TANKERSLEY. WE HAD SEVERAL MEETINGS WITH THE EXECUTOR TO GET INSTRUCTION AS TO HOW THE FARM WAS TO BE DIVIDED. RESEARCHING RECORDS AND RETRACEMENT WAS A LARGE PART OF THE JOB.
VALUE – $12,569
PERSON IN CHARGE – JAMES M. ANDERSON AND MATT ANDERSON